Upcoming Construction in West Tennessee

Various lane closures scheduled in West Tennessee from August 14-21, 2024.

From August 14 to August 21, 2024, there will be potential daytime and nighttime lane closures at various locations in West Tennessee’s Region 4. These closures will facilitate repairs and new installations across 21 counties. Below are the specifics for each district and county:

**District 47**

**Benton County**

I-40: Nighttime temporary lane closures for resurfacing from S.R. 69 (MM 126) to the Humphreys County line (Tennessee River Bridge).

– SR 391: Temporary lane closures for resurfacing from US 70W (SR 1, LM 0.00) to US 70E (SR 1, LM 5.31).

**Carroll County**

– SR-76 (US-79): Lane closures for grading, drainage, noise walls, signals, and paving from near S.R. 77 (L.M. 1.89) to near Cutlip Lane (L.M. 7.29).

**Dyer County**

– SR-20: Temporary lane closures for bridge repair on US 412 (SR 20) over North Fork Forked Deer River.

– SR-211: Outside lane closures for bridge inspection over North Fork Forked Deer River starting August 9, 2024.

**Gibson/Carroll County**

– SR-76 (US-79): Temporary lane closures for grading, drainage, concrete box bridge construction, noise wall, and paving from west of Cades-Atwood Road (Gibson County) to east of SR 77 (Carroll County). Barker Road is permanently closed, with detours provided.

**Henry/Weakley County**

– SR-22: Temporary lane closures for resurfacing with HOT IN-PLACE RECYCLING from Carroll County Line (Henry County) to SR 217 (Weakly County).

**Obion County**

– Future I-69 (Phase 3): SR 690 (Future I-69) is now open with reduced speed limits. Construction continues on closed ramps.

**Weakley County**

– SR-445: Temporary lane closures for safety improvements and resurfacing from Gibson County Line to near Losson Puckett Road.

**District 48**

**Crockett County**

– US-412 (SR-20): Temporary lane closures for resurfacing with hot-in-place recycling from Birmingham/Lyons Road to US-79 (SR-76).

**Gibson and Crockett County**

– S.R. 152: Temporary lane closures for resurfacing, bridge expansion joint, and deck repairs from US 412 (S.R. 20) to US 70A (S.R. 366).

**Hardin County**

– SR 128: Temporary lane closures for bridge rehabilitation over Pickwick Dam starting August 19, 2024.

**Haywood County**

– I-40: Nightly lane closures for resurfacing from MM 60 to 67 (near SR19 to Hawkins Lane) from August 14-21 and August 21-28.

– SR 179: Temporary lane closures for resurfacing with Full-Depth Reclamation (FDR) from US70 (SR1) to SR76.

– SR 222: Inside lane closures for construction from June 24 to August 31.

**Henderson County**

– I-40: Intermittent lane closures for geotechnical bores from MM 100.0 to MM 101.4 from August 21-23 and August 26-30.

**Madison County**

– SR 152: Temporary lane closures for milling and repaving on SR 152 at the I-40 overpass (Exit 93) on August 14-15.

**District 49**

**Fayette County**

– SR-222: Temporary lane closures for grading, drainage, signals, and paving from Hebron Drive to near Thorpe Drive, including the I-40 interchange (Exit 42). Lane closures on I-40 from MM41-MM43 for milling and paving on August 19-23.

**Lauderdale County**

– US-51 (SR-3): Temporary lane closures for resurfacing from SR-88 to the Dyer County Line and from the Tipton County Line to SR-19.

– SR-19: Temporary lane closures for resurfacing from US-51 (SR-3) to Near Eastland Avenue.

**Shelby County**

– I-55: Rolling roadblocks for dynamic message board replacement from August 20-22.

– I-240: Ramp closures for vegetation removal at various exits from August 14-23.

– I-40: Nightly lane closures for resurfacing from the Wolf River MM 11.2 to Sycamore View Road MM 12.6.

– SR-3: Nightly lane closures for resurfacing from Babe Howard Blvd. to the Tipton County line.

– SR-14 (Austin Peay Highway): Shoulder and lane closures for widening from Kerrville-Rosemark Rd. to the Tipton County Line.

– I-240 at Exit 23 (Airways Blvd.): Ongoing lane closures until September 1, 2024.

– I-55/Crump: Various restrictions and lane closures with posted detours.

– SR-57: Daily and nightly lane closures for catch basin adjustments and striping operations in Collierville.

– SR-23 (Walnut Grove Rd): Nightly lane closures for resurfacing from Poplar Ave to I-240.

– SR-385: Nightly lane closures for pavement crack sealing from Ridgeway to Byhalia.

– SR-177 (Germantown Road): Long-term lane closures for widening and improvements.

**Tipton County**

– US-51 (SR-3): Temporary lane closures for safety improvements at Kenwood Avenue.

**Non-TDOT Work**

**Shelby County**

– SR-177 (Germantown Road): Long-term lane closures for widening and intersection improvements from Brierbrook to the Wolf River.

For the latest construction activity and live-streaming SmartWay traffic cameras, visit www.TNSmartWay.com/Traffic. Travelers can also dial 511 for travel information or follow on Twitter at https://twitter.com/myTDOT for statewide updates or https://twitter.com/NicLawrenceTDOT for West Tennessee updates.

Drivers are reminded to use all motorist information tools wisely and check travel conditions before leaving for their destinations.

Source: Read Original Release

River Trace Roadway Closure Update

The Nashville Department of Transportation and Multimodal Infrastructure (NDOT) continues to monitor and address safety concerns on River Trace off State Route 12, coordinating with various stakeholders to develop a mitigation plan. Residents can report concerns to the Office of Emergency Management, and updates are available via subscription. Temporary closure details and detours can be accessed online.