East Tennessee Construction Updates for July 18-24, 2024

Weekly road construction updates for East Tennessee from July 18 to July 24, 2024.

The Tennessee Department of Transportation (TDOT) has released its weekly construction report for East Tennessee, detailing various projects and potential traffic impacts for the week of July 18-24, 2024. Motorists are advised to stay informed about potential delays and exercise caution in the affected areas.

**Anderson County**

– **I-75 North and South (Mile Marker 117.6 to 122):** Possible nightly lane closures from 7 p.m. to 6 a.m. for resurfacing.

– **SR 62 (between SR 61 and Union Valley Road):** Possible temporary lane closures nightly from 7 p.m. to 6 a.m.

– **SR 95 (between SR 61 and SR 62):** Possible temporary lane closures nightly from 7 p.m. to 6 a.m.

**Blount County**

– **US 321/SR 73 (between Tuckaleechee Pike and Bridge over Hesse Creek):** Possible temporary lane closures nightly from 7 p.m. to 6 a.m. for resurfacing.

– **SR 334 bridge over CSX Railroad:** Lane closures for bridge repair, exercise extreme caution.

**Campbell County**

– **I-75 North and South (Mile Markers 140 to 147):** Possible nightly lane closures from 7 p.m. to 6 a.m. for resurfacing.

– **SR 9 Bridge over Cove Lake:** Reduced to one lane in each direction around the clock until July 31, 2024.

– **SR 63 (between Frontier Road/Woodson Lane and Claiborne County Line):** Possible temporary lane closures from 8 a.m. to 6 p.m.

**Claiborne County**

– **SR 63 (between Campbell County Line and Hall Lane):** Possible temporary lane closures from 8 a.m. to 6 p.m.

**Cocke County**

– **SR 35 (between Old Newport Highway and Fain Road):** Possible temporary lane closures from 7 a.m. to 5 p.m.

**Greene County**

– **I-81 North and South (Mile Markers 44 to 50):** Possible temporary lane closures nightly from 7 p.m. to 6 a.m. for resurfacing.

**Hamblen County**

– **US 11/SR 34 (between N. Bellwood Road and Merchant Greene Boulevard):** Possible lane closures nightly from 7 p.m. to 6 a.m. for intersection improvement.

– **US 25/SR 32 at Progress Parkway/Thoroughbred Run Road:** Possible lane shifts, exercise extreme caution.

**Hancock County**

– **SR 33 (between Campbell Drive and Harrison Street):** Closed for bridge replacement, follow signed detour.

**Jefferson County**

– **I-81 South (near Mile Marker 3.1):** Possible lane closures on July 23, 2024, from 8 p.m. to 6 a.m. for guardrail repairs.

– **US 25/70/SR 9 over Rimmer Creek and Koontz Creek:** Possible lane closures at various times.

– **SR 113 at SR 341:** Possible lane closures daily from 9 a.m. to 3 p.m. for intersection improvement.

**Johnson County**

– **SR 67 (between US 421 and Pedro Shoun Ln.):** Possible lane closures daily from 8 a.m. to 6 p.m. for resurfacing.

– **SR 418 (between US 421 and Hady St.):** Possible nightly lane closures from 7 p.m. to 6 a.m. for resurfacing.

**Knox/Sevier County**

– **I-40 East and West (Mile Markers 402 to 407):** Possible rolling roadblocks on July 21, 2024, from 6 a.m. to Noon for utility work.

**Knox County**

– **I-140 East (Mile Marker 9.0 to 9.6):** Possible lane closures nightly from 7 p.m. to 6 a.m. for ITS expansion.

– **I-640 East and West (Mile Markers 6 to 10):** Reduced from three lanes to two around the clock for resurfacing. For more information, visit I-640 Reconstruction Project.

– **Various Interstates through Knoxville:** Possible mobile lane closures nightly from 8 p.m. to 6 a.m. for roadway maintenance.

– **US 129/SR 115 Alcoa Highway (Topside Road to Maloney Road):** Possible temporary lane closures and shifts. For details, visit Alcoa Highway Project.

– **US 129/SR 115 Alcoa Highway (Woodson Drive to Cherokee Trail):** Possible temporary nightly lane closures from 7 p.m. to 6 a.m. For details, visit State Route 115 Project.

– **US 441/SR 71 (Simpson Road to Hendron Chapel Road):** Possible lane closures and changed conditions.

**Loudon County**

– **I-75 North and South (Mile Markers 66 to 74):** Possible nightly lane closures from 7 p.m. to 6 a.m. for resurfacing.

**Roane County**

– **I-40 West at Lawnville Road (Exit 355):** Entrance ramp closure on July 22, 2024, from 7 a.m. to 7 p.m. for concrete ramp repairs.

– **SR 61 at I-40:** Possible lane closures daily from 8 a.m. to 4:30 p.m. for lighting project.

**Sullivan County**

– **SR 36 (Log Miles 4.7 to 7.7):** Possible nightly lane closures from 7 p.m. to 6 a.m. for resurfacing.

– **SR 75 (Log Miles 3.18 to 3.99):** Possible lane closures at various times.

– **SR 93 Bridge over South Fork Holston River and Plant Road:** Possible lane closures at various times for bridge repair.

– **SR 357 (Log Miles 0.2 to 2.4):** Possible lane closures daily from 8 a.m. to 8 p.m. for resurfacing.

**Unicoi County**

– **I-26 East (near Mile Marker 40.5):** Possible lane closures on July 22, 2024, from 8 p.m. to 6 a.m. for guardrail repairs.

**Union County**

– **SR 33 (Knox County Line to SR 144):** Possible lane closures at various times for widening project.

**Washington County**

– **I-26 East (near Mile Marker 14):** Possible lane closures on July 22, 2024, from 8 p.m. to 6 a.m. for guardrail repairs.

– **SR 381 University Parkway (W. Locust to State of Franklin):** Lane closures and shifts for utility construction through August 16, 2024.

For detailed information on statewide interstate construction, visit the TDOT SmartWay website. For real-time traffic updates in Knoxville and the Tri-Cities, follow TDOT on Twitter at www.twitter.com/knoxville511 or for statewide travel information follow www.twitter.com/TN511.

Source: Read Original Release

NDOT Monitors River Trace for Safety

The Nashville Department of Transportation and Multimodal Infrastructure (NDOT) is monitoring River Trace’s safety, collaborating with Geotech Consultants for a detailed geologic analysis due by July 19, 2024, to determine remediation methods.